Brazil

Pirapora II — 115 MW Solar

Solar Renewable Verified

Pirapora II is a 115 MW solar power plant located in Brazil. View location, capacity, and technical details.

Capacity
115 MW

Installed

Commissioned
2017

Year online

Owner
Canadian Solar

Operator

Location
-17.40, -44.88

Coordinates

Insights

#263
largest in %s
#241
largest %s worldwide
#9,472
largest worldwide
2017
%d yrs newer than avg
15
operated by %s
6
plants within 100 km

Technical Details

Fuel Type
Solar
Capacity
115 MW
Commissioned
2017
Status
Operational
Owner
Canadian Solar
Country
Brazil
Coordinates
-17.400, -44.880

Estimated Carbon Footprint

Annual CO₂
7,435 t

tonnes / year

Lifetime CO₂
223,038 t

over ~%d yrs

Intensity
41 g

gCO₂ per kWh

Annual emissions equal to

1,616
cars / year
991
homes / year
337,937
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Pirapora II is a 115 MW solar power plant located in Brazil. This facility generates electricity from solar energy and contributes to the growing renewable energy sector in the country. Commissioned in 2018, it is part of Brazil’s efforts to diversify its energy sources.

It ranks as the 8th largest solar plant in Brazil. With 115 MW, it represents 6.59% of Brazil’s total solar capacity of 1,745 MW. Brazil has 24 solar plants with a combined capacity of 1,745 MW. Compared to the largest solar plant in Brazil, Ituverava at 210 MW, Pirapora II is approximately 55% the size.

Solar energy is becoming increasingly important in Brazil’s energy mix, contributing to around 1.5% of the total electricity generation. The country’s geographic conditions, with high solar irradiation, support the development of solar power plants. Pirapora II is located in the state of Minas Gerais, approximately 300 km from the city of Belo Horizonte.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.