Chile

Cerro Dominador CSP — 110 MW Solar

Solar Renewable Verified

Cerro Dominador CSP is a 110 MW solar power plant located in Chile. View location, capacity, and technical details.

Capacity
110 MW

Installed

Commissioned
2017

Year online

Owner
Cerro Dominador

Operator

Location
-22.78, -69.49

Coordinates

Insights

#77
largest in %s
#247
largest %s worldwide
#9,608
largest worldwide
2017
%d yrs newer than avg
2
operated by %s
27
plants within 100 km

Technical Details

Fuel Type
Solar
Capacity
110 MW
Commissioned
2017
Status
Operational
Owner
Cerro Dominador
Country
Chile
Coordinates
-22.782, -69.485

Estimated Carbon Footprint

Annual CO₂
7,111 t

tonnes / year

Lifetime CO₂
213,341 t

over ~%d yrs

Intensity
41 g

gCO₂ per kWh

Annual emissions equal to

1,546
cars / year
948
homes / year
323,244
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Cerro Dominador CSP is a 110 MW solar power plant located in the Atacama Desert, Chile. This facility is part of a larger initiative to harness renewable energy sources in the region and is operated by an undisclosed entity.

Ranking as the 11th largest solar plant in Chile, Cerro Dominador contributes to a total solar capacity of 4,458 MW from 81 plants across the country. With its 110 MW capacity, it accounts for approximately 2.47% of Chile’s total solar generation capacity. The largest solar plant, Copiapó Solar Project, has a capacity of 390 MW, making Cerro Dominador about 28% the size of this facility.

Solar energy is increasingly significant in Chile’s energy mix, especially in the northern regions where solar irradiation is high. The country aims to expand its renewable energy footprint to reduce reliance on fossil fuels. Cerro Dominador is situated approximately 1,000 km north of Santiago in the Antofagasta Region.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.