UZB

Charvak — 620 MW Hydroelectric

Hydroelectric Renewable Verified

Charvak is a 620 MW hydro power plant located in Uzbekistan. View location, capacity, and technical details.

Capacity
620 MW

Installed

Commissioned
1972

Year online

Owner
Uzbekenergo

Operator

Location
41.63, 69.97

Coordinates

Insights

#7
largest in %s
#607
largest %s worldwide
#3,905
largest worldwide
1972
%d yrs older than avg
16
operated by %s
8
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
620 MW
Commissioned
1972
Status
Operational
Owner
Uzbekenergo
Country
UZB
Coordinates
41.627, 69.969

Estimated Carbon Footprint

Annual CO₂
52,140 t

tonnes / year

Lifetime CO₂
4.2M t

over ~%d yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

11,335
cars / year
6,952
homes / year
2.4M
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

The Charvak Hydro Power Plant, commissioned in 1972, is a significant energy facility located in Uzbekistan, with a total capacity of 620 megawatts (MW). Owned and operated by Uzbekenergo, the state energy company, the plant harnesses the hydropower potential of the Charvak Reservoir, situated in the picturesque Chatkal Mountains. This facility plays a crucial role in Uzbekistan’s energy sector, contributing to the country’s electricity generation and supporting its economic development.

As a hydroelectric power plant, Charvak utilizes the kinetic energy of flowing water to produce electricity. Water from the Charvak Reservoir is channeled through turbines, converting the energy of moving water into mechanical energy, which is then transformed into electrical energy. This process is not only renewable but also provides a reliable source of power, as it can operate continuously as long as water resources are available. The use of hydroelectric power is particularly advantageous in Uzbekistan, where the abundance of rivers and mountainous terrain offers substantial potential for hydropower generation.

In terms of environmental impact, the Charvak Hydro Power Plant presents a more sustainable alternative to fossil fuel-based energy sources. Hydropower generation produces minimal greenhouse gas emissions compared to coal or natural gas facilities, thereby contributing to a reduction in the overall carbon footprint of Uzbekistan’s energy sector. However, it is essential to recognize that large-scale hydroelectric projects can have ecological consequences, such as changes in local ecosystems and the displacement of communities. In the case of Charvak, careful management and monitoring are necessary to mitigate these impacts while balancing the demand for clean energy.

Regionally, the Charvak Hydro Power Plant holds strategic significance. It not only supplies electricity to Uzbekistan but also supports neighboring countries in Central Asia, enhancing regional energy cooperation. The plant’s output contributes to the stability of the national grid and helps meet the growing electricity demand driven by industrialization and urbanization. Furthermore, the Charvak Reservoir serves recreational purposes, attracting tourists to the area and promoting local economic development.

Overall, the Charvak Hydro Power Plant stands as a vital pillar of Uzbekistan’s energy infrastructure, exemplifying the country’s commitment to harnessing renewable resources for sustainable development. As Uzbekistan continues to modernize its energy sector, facilities like Charvak will play an essential role in ensuring energy security, fostering economic growth, and addressing environmental challenges.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.