Cinco de Noviembre Hydroelectric Power Plant El Salvador — 99 MW Hydroelectric
Cinco de Noviembre Hydroelectric Power Plant El Salvador is a 99 MW hydro power plant located in El Salvador. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 99 MW
- Commissioned
- 2015
- Status
- Operational
- Owner
- CEL
- Country
- SLV
- Coordinates
- 13.991, -88.758
Estimated Carbon Footprint
tonnes / year
over ~80 yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Acajutla Thermal Power Plant El Salvador
El Salvador · Oil
15 de Septiembre Hydroelectric Power Plant El Salvador
El Salvador · Hydroelectric
Cerron Grande Hydroelectric Power Plant El Salvador
El Salvador · Hydroelectric
Nejapa IC Power Plant El Salvador
El Salvador · Oil
Berlin Geothermal Power Plant El Salvador
El Salvador · Geothermal
Providencia
El Salvador · Solar
About this plant
Cinco de Noviembre Hydroelectric Power Plant is a 99.4 MW hydroelectric facility in El Salvador, commissioned in 2019.
Ranked #3 of 4 hydro plants in El Salvador. Its 99.4 MW accounts for 21.18% of El Salvador’s total hydro capacity of 469 MW. The largest hydro plant in El Salvador is 15 de Septiembre Hydroelectric Power Plant at 180 MW, making Cinco de Noviembre 1.8 times smaller.
Nearby plants within 50 km include 15 de Septiembre Hydroelectric Power Plant (180.2 MW, Hydro), Cerron Grande Hydroelectric Power Plant (170 MW, Hydro), and Nejapa IC Power Plant (151.2 MW, Oil). The facility is located in La Libertad, approximately 30 km northeast of San Salvador.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.