SLV

Nejapa IC Power Plant El Salvador — 151 MW Oil

Oil Verified

Nejapa IC Power Plant El Salvador is a 151 MW oil power plant located in El Salvador. View location, capacity, and technical details.

Capacity
151 MW

Installed

Commissioned
2010

Year online

Owner
Energia del Sur

Operator

Location
13.78, -89.20

Coordinates

Insights

#4
largest in %s
#361
largest %s worldwide
#8,343
largest worldwide
2010
%d yrs newer than avg
13
operated by %s
12
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
151 MW
Commissioned
2010
Status
Operational
Owner
Energia del Sur
Country
SLV
Coordinates
13.778, -89.201

Estimated Carbon Footprint

Annual CO₂
344,373 t

tonnes / year

Lifetime CO₂
10.3M t

over ~%d yrs

Intensity
650 g

gCO₂ per kWh

Annual emissions equal to

74,864
cars / year
45,916
homes / year
15.7M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

As the fourth largest power generation facility in El Salvador, Nejapa IC Power Plant stands out with a capacity of 151.2 MW. In the context of the country’s energy landscape, where only 16 power generation facilities operate, this plant’s contribution represents an impressive 10.66% of the nation’s total capacity of 1,419 MW, predominantly fueled by oil, making it the second largest oil facility in the country.

Commissioned in 2010, the Nejapa IC Power Plant utilizes advanced oil-powered generation technology, providing a reliable source of electricity in a region where energy demand is ever-increasing. Despite the reliance on oil, the facility plays a pivotal role in ensuring energy security and stability for El Salvador, especially in times of fluctuating fuel prices and supply chain challenges.

Geographically, Nejapa IC is situated near several other notable facilities, including the Cerron Grande Hydroelectric Power Plant, which has a capacity of 170 MW, and the Providencia Solar Plant at 101 MW. The presence of these diverse energy sources—hydro and solar—indicates a gradual shift in the country toward incorporating renewable energy into its energy mix. Nearby installations like the Cinco de Noviembre Hydroelectric Power Plant and various solar plants further underline the region’s commitment to expanding its energy portfolio.

El Salvador’s energy profile is heavily influenced by oil, which dominates the generation landscape. However, as the country makes strides toward diversifying its energy sources, Nejapa IC Power Plant remains critical in bridging the gap between traditional fossil fuels and emerging renewables. The plant’s significant share of national capacity highlights its importance in maintaining a stable energy supply.

Looking ahead, Nejapa IC Power Plant is positioned to play a vital role in El Salvador’s energy transition. With ongoing investments in renewable technologies and a focus on sustainability, the facility’s operations may evolve to align with national goals of reducing dependency on fossil fuels. As the country endeavors to enhance its energy resilience, the contributions of Nejapa IC will be crucial in fostering both economic growth and environmental stewardship.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.