Spain

CT ESCOMBRERAS 5 — 537 MW Oil

Oil Verified

CT ESCOMBRERAS 5 is a 537 MW oil power plant located in Spain. View location, capacity, and technical details.

Capacity
537 MW

Installed

Commissioned
1968

Year online

Owner
IBERDROLA GENERACION S.A.

Operator

Location
37.56, -0.95

Coordinates

Insights

#82
largest in Spain
#157
largest Oil worldwide
#4,435
largest worldwide
1968
29 yrs older than avg
32
operated by IBERDROLA GENERACION S.A.
37
plants within 100 km

Technical Details

Fuel Type
Oil
Capacity
537 MW
Commissioned
1968
Status
Operational
Owner
IBERDROLA GENERACION S.A.
Country
Spain
Coordinates
37.565, -0.951

Estimated Carbon Footprint

Annual CO₂
1,223,709 t

tonnes / year

Lifetime CO₂
36,711,268 t

over ~30 yrs

Intensity
650 g

gCO₂ per kWh

Annual emissions equal to

266,024
cars / year
163,161
homes / year
55,623,133
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

CT ESCOMBRERAS 5 is a significant oil-fired power plant located in Spain, with a generating capacity of 537.28 megawatts (MW). Commissioned in 1968, this facility is owned and operated by IBERDROLA GENERACION S.A., one of the leading energy companies in Spain. The power plant plays a crucial role in the country’s energy sector, particularly during peak demand periods when electricity consumption surges. Although the reliance on oil as a fuel source is declining in many parts of the world due to environmental concerns, CT ESCOMBRERAS 5 remains a noteworthy part of Spain’s energy infrastructure, especially in regions where alternative energy sources may not yet provide sufficient capacity.

The plant utilizes oil as its primary fuel, a choice that reflects the technological and economic landscape of the late 1960s when it was commissioned. Oil-fired power plants like CT ESCOMBRERAS 5 have historically been favored for their ability to generate electricity quickly and efficiently, responding to fluctuations in demand with relative ease. However, oil combustion produces greenhouse gases and other pollutants, leading to air quality issues and contributing to climate change. As a result, many countries, including Spain, are transitioning towards more sustainable energy sources such as wind, solar, and hydroelectric power.

Despite its environmental drawbacks, CT ESCOMBRERAS 5 continues to hold regional significance. It serves as a vital backup resource that helps stabilize the electricity grid, particularly in the Murcia region. The flexibility of oil-fired plants allows them to complement renewable energy sources, which can be intermittent. During periods of low renewable output, CT ESCOMBRERAS 5 can ramp up production to ensure a consistent power supply. This capability is especially important as Spain increases its reliance on renewable energy and seeks to reduce its carbon footprint.

The environmental impact of CT ESCOMBRERAS 5 is a subject of concern, particularly in the context of Spain’s commitment to the European Union’s emissions targets. The operation of the plant contributes to air pollution, including emissions of sulfur dioxide (SO2) and nitrogen oxides (NOx), which can have detrimental effects on local air quality and public health. To mitigate these impacts, IBERDROLA has invested in technologies aimed at improving efficiency and reducing emissions, although the fundamental challenges related to oil as a fuel source remain.

In summary, CT ESCOMBRERAS 5 represents a significant legacy of Spain’s energy sector, reflecting both the historical reliance on oil for electricity generation and the ongoing transition towards more sustainable energy systems. While it provides critical support to the electricity grid, the environmental implications of its operation highlight the need for a balanced approach to energy generation that prioritizes both reliability and sustainability.

More Oil plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.