Spain

LITORAL DE ALMERIA GR 2 — 1,120 MW Coal

Coal Verified

LITORAL DE ALMERIA GR 2 is a 1,120 MW coal power plant located in Spain. View location, capacity, and technical details.

Capacity
1,120 MW

Installed

Commissioned
1997

Year online

Owner
ENDESA GENERACION S.A.

Operator

Location
36.98, -1.91

Coordinates

Insights

#20
largest in Spain
#867
largest Coal worldwide
#2,188
largest worldwide
1997
at fleet average
57
operated by ENDESA GENERACION S.A.
26
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
1,120 MW
Commissioned
1997
Status
Operational
Owner
ENDESA GENERACION S.A.
Country
Spain
Coordinates
36.978, -1.905

Estimated Carbon Footprint

Annual CO₂
4,423,231 t

tonnes / year

Lifetime CO₂
176,929,256 t

over ~40 yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

961,572
cars / year
589,764
homes / year
201,055,972
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

The Litoral de Almeria GR 2 power plant, located in Spain, is a significant installation in the country’s energy sector with a generation capacity of 1,119.59 MW. Owned by Endesa Generación S.A., the plant was commissioned in 1997 and primarily utilizes coal as its fuel source. This facility plays a crucial role in meeting the electricity demands of the region and contributes to the overall energy mix of Spain, particularly during peak usage times when renewable sources may be insufficient to meet demand.

Coal, as a fuel type, is characterized by its availability and energy density, making it a historically favored option for power generation. In the case of Litoral de Almeria GR 2, the plant utilizes coal to produce steam that drives turbines, thereby generating electricity. While coal plants like Litoral de Almeria GR 2 have been instrumental in providing a stable energy supply, they also face scrutiny due to their environmental impact. The combustion of coal releases significant amounts of carbon dioxide (CO2), sulfur dioxide (SO2), and particulate matter, contributing to air pollution and climate change. As a result, the plant’s operation aligns with the ongoing transition in Spain toward cleaner energy sources, although it still remains a critical component of the country’s energy infrastructure.

The environmental implications of coal-fired power generation have led to increased regulatory pressures and public demand for cleaner alternatives. In response, Endesa and other energy companies are exploring options to reduce emissions, such as carbon capture technologies and transitioning to lower-emission fuels. Nevertheless, the Litoral de Almeria GR 2 plant continues to serve as an essential asset in the region, providing a reliable energy source that supports local economies and industries.

Regionally, the Litoral de Almeria GR 2 power plant is strategically significant. It not only helps to stabilize the electricity supply for the province of Almeria but also for the broader Andalusian region. This capability is particularly important given the fluctuating nature of renewable energy sources such as solar and wind, which can be highly variable. The presence of this coal plant enhances energy security, ensuring that electricity is available even during periods of low renewable production.

In conclusion, while the Litoral de Almeria GR 2 coal power plant has played a vital role in Spain’s energy landscape since its commissioning, it also exemplifies the challenges faced by coal-fired power generation in an increasingly environmentally conscious world. The balance between energy demand, economic necessity, and environmental responsibility continues to shape the future of this facility and others like it across the country.

More Coal plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.