Eldorado is a 141 MW biomass power plant located in Brazil. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Biomass
- Capacity
- 141 MW
- Commissioned
- 2011
- Status
- Operational
- Owner
- Eldorado Brasil
- Country
- Brazil
- Coordinates
- -21.851, -54.016
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Porto Primavera (Eng° Sérgio Motta)
Brazil · Hydroelectric
Rosana
Brazil · Hydroelectric
Usina Hidrelétrica de Rosana
Brazil · Hydroelectric
Modular de Campo Grande (Willian Arjona)
Brazil · Natural Gas
Santa Luzia I
Brazil · Biomass
Amandina
Brazil · Biomass
About this plant
Eldorado emerges as a notable player in Brazil’s energy landscape, ranking 227th among 2,402 power generation facilities with a capacity of 141.019 MW. As the 9th largest biomass plant in the country, Eldorado reflects Brazil’s growing interest in diversifying its energy sources, especially amid a predominantly hydro-driven energy profile that encompasses a total capacity of 250,382 MW. Commissioned in 2011, Eldorado harnesses biomass, which includes organic materials such as agricultural waste, turning potential waste into a valuable energy resource. This facility’s contribution of just 0.06% to national capacity may seem minor, but it symbolizes an important step toward sustainability in a country where hydroelectric power often overshadows other energy forms. Situated within a biomass-rich region, Eldorado is flanked by other biomass plants, including Santa Luzia I with a capacity of 130 MW and Angélica at 96 MW, forming a localized energy cluster that capitalizes on available organic resources. This proximity highlights the potential for collaborative energy generation and the optimization of biomass utilization in the region. Brazil’s approach to energy security increasingly emphasizes the need for renewable sources like biomass, especially as environmental concerns rise and the demand for clean energy solutions intensifies. As Eldorado continues to operate, it stands as a testament to Brazil’s commitment to integrating alternative energy sources into its grid, promoting economic growth while also addressing environmental challenges.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.