MKD

Globocica (Crn Drim) Hydroelectric Power Plant Macedonia — 42 MW Hydroelectric

Hydroelectric Renewable Verified

Globocica (Crn Drim) Hydroelectric Power Plant Macedonia is a 42 MW hydro power plant located in Macedonia. View location, capacity, and technical details.

Capacity
42 MW

Installed

Commissioned

Year online

Owner

Operator

Location
41.34, 20.63

Coordinates

Insights

#7
largest in Macedonia
#3,404
largest Hydroelectric worldwide
#14,931
largest worldwide
15
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
42 MW
Commissioned
Status
Operational
Owner
Country
MKD
Coordinates
41.337, 20.635

Estimated Carbon Footprint

Annual CO₂
3,532 t

tonnes / year

Lifetime CO₂
282,563 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

768
cars / year
471
homes / year
160,547
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Globocica (Crn Drim) Hydroelectric Power Plant is a 42 MW hydro power plant in Macedonia, operated since its commissioning.

Ranked #5 of 10 hydro plants in Macedonia, Globocica’s 42 MW represents 7.47% of Macedonia’s total hydro capacity of 563 MW. The largest hydro plant in Macedonia is Vrutok at 150 MW, making Globocica 3.6 times smaller.

Nearby plants within 50 km include Vrutok (150 MW, Hydro) and Oslomej (125 MW, Coal). The facility is located in the region of Vardar, approximately 60 km southwest of Skopje.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.