P.E. DOLAR 1 is a 99 MW wind power plant located in Spain. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Wind
- Capacity
- 99 MW
- Commissioned
- 2007
- Status
- Operational
- Owner
- IBERDROLA RENOVABLES DE ANDLAUCIA.S.AU.
- Country
- Spain
- Coordinates
- 37.177, -2.950
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
About this plant
P.E. DOLAR 1 is a 99 MW wind power plant in Spain, operated by IBERDROLA RENOVABLES DE ANDLAUCIA S.A.U. since 2007.
Ranked #1 of 342 wind plants in Spain, P.E. DOLAR 1’s 99 MW represents 0.88% of Spain’s total wind capacity of 11,210 MW. The largest wind plant in Spain is P.E. DOLAR 1 at 99 MW, making it equal in size to itself.
Nearby plants within 50 km include Andasol solar power station (149.7 MW, Solar), ANDASOL-3 (149.7 MW, Solar), and P.E. LA CERRADILLA (63.5 MW, Wind). The facility is located in the Almería province, approximately 200 km from the city of Granada.
More %s plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.