PESHTERA is a 135 MW hydro power plant located in Bulgaria. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 135 MW
- Commissioned
- 1970
- Status
- Operational
- Owner
- NPP PESHTERA
- Country
- BGR
- Coordinates
- 42.013, 24.257
Carbon Footprint
tonnes / year
over ~80 yrs
Est. gCO2/kWh
Annual emissions equivalent to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Plants
PSCHAIRA GEN
Bulgaria · Hydroelectric
Bobov Dol power station
Bulgaria · Coal
PSBELMEKEN
Bulgaria · Hydroelectric
SESTRIMO
Bulgaria · Hydroelectric
Maritsa 3 power station
Bulgaria · Coal
Momina Klisura Hydroelectric Power Station
Bulgaria · Hydroelectric
About this plant
PESHTERA, a hydroelectric power generation facility in Bulgaria, ranks as the 4th largest hydro plant in the country and holds a significant 1.46% share of the national total capacity of 9,252 MW. With a generation capacity of 135 MW, PESHTERA is an integral part of Bulgaria’s energy landscape where coal remains the dominant fuel. The facility utilizes traditional hydroelectric technology, harnessing the flow of water to generate electricity, which is critical in a country that is increasingly focusing on renewable energy sources. Located in a region rich with hydro resources, PESHTERA is close to several other prominent hydro plants, including PSCHAIRA GEN (864 MW), PSBELMEKEN (375 MW), SESTRIMO (240 MW), and MOMINA KLISU (120 MW). This clustering of hydroelectric facilities enhances the overall stability and reliability of the regional grid. Despite the presence of these other plants, PESHTERA stands out for its efficiency and contribution to the national grid. Bulgaria’s energy profile is evolving, with a growing emphasis on diversifying energy sources beyond coal. PESHTERA’s role in this transition underscores the importance of renewable energy in achieving national and EU climate goals. The plant, which has been operational for several years, is part of the larger vision of increasing Bulgaria’s renewable energy output. As the country navigates its path towards sustainability, PESHTERA will continue to be a pivotal player in the shift towards cleaner energy, supporting both economic growth and environmental stewardship.
More Hydroelectric plants
Spotted an error?
Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.