Canada

Shawinigan-3 — 194 MW Hydroelectric

Hydroelectric Renewable Verified

Shawinigan-3 is a 194 MW hydro power plant located in Canada. View location, capacity, and technical details.

Capacity
194 MW

Installed

Commissioned
2000

Year online

Owner
Hydro-Québec

Operator

Location
46.53, -72.77

Coordinates

Insights

#173
largest in Canada
#1,499
largest Hydroelectric worldwide
#7,605
largest worldwide
2000
16 yrs newer than avg
175
operated by Hydro-Québec
24
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
194 MW
Commissioned
2000
Status
Operational
Owner
Hydro-Québec
Country
Canada
Coordinates
46.534, -72.766

Estimated Carbon Footprint

Annual CO₂
16,315 t

tonnes / year

Lifetime CO₂
1,305,170 t

over ~80 yrs

Intensity
24 g

gCO₂ per kWh

Annual emissions equal to

3,547
cars / year
2,175
homes / year
741,574
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Stations

About this plant

Ranked as the 173rd largest power generation facility in Canada, Shawinigan-3 stands as a significant contributor to the nation’s hydroelectric landscape. With a capacity of 194 MW, this hydro plant is among the 612 hydro facilities in the country, placing it 97th in hydro capacity rankings. Situated in Quebec, Shawinigan-3 is an essential component of Hydro-Québec’s extensive network, illustrating the province’s commitment to renewable energy sources, particularly hydroelectric power, which dominates Canada’s energy profile. The facility contributes approximately 0.10% to Canada’s total capacity of 193,190 MW, showcasing its pivotal, albeit modest, role in the overall energy mix.

The technology utilized at Shawinigan-3 is typical of hydroelectric plants, harnessing the kinetic energy of flowing water to generate electricity. This method not only provides a renewable source of energy but also boasts a low environmental impact compared to fossil fuel counterparts. The plant’s design enables it to efficiently convert the gravitational potential energy of water into electrical energy, making it a model of sustainable energy production.

In its regional context, Shawinigan-3 is part of a diverse energy cluster. Notably, within a 50 km radius, other significant facilities include the Gentilly Nuclear Generating Station, boasting a capacity of 675 MW, and the Bécancour facility, which operates on natural gas with capacities of 507 MW and 411 MW. Additionally, the Rocher-de-Grand-Mère hydro facility, with a capacity of 230 MW, and Shawinigan-2, at 200 MW, further illustrate the variety of energy sources in the area, emphasizing the importance of hydroelectric power in this energy landscape.

Canada’s energy profile is heavily dominated by hydroelectric power, which accounts for a significant portion of the national capacity. This reliance on renewable sources is vital for meeting the energy demands of a growing population while striving to reduce carbon emissions. Shawinigan-3 plays a crucial role in this framework, helping to stabilize the grid and provide a reliable power supply.

Operated by Hydro-Québec, Shawinigan-3 was commissioned years ago, contributing to the province’s energy infrastructure for decades. Its strategic operation reflects the utility’s commitment to sustainable energy practices and the continued development of renewable energy resources in Canada.

Looking forward, Shawinigan-3 represents more than just a power generation facility; it symbolizes the broader transition towards renewable energy. As Canada continues to prioritize sustainability and reduce its carbon footprint, plants like Shawinigan-3 will be integral in supporting the country’s energy needs while promoting environmental stewardship.

More Hydroelectric plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.