Stesen Janakuasa Murum is a 944 MW hydro power plant located in Malaysia. View location, capacity, and technical details.
Installed
Year online
Operator
Coordinates
Insights
Location
Technical Details
- Fuel Type
- Hydroelectric
- Capacity
- 944 MW
- Commissioned
- 2014
- Status
- Operational
- Owner
- Sarawak Energy
- Country
- Malaysia
- Coordinates
- 2.671, 114.295
Estimated Carbon Footprint
tonnes / year
over ~%d yrs
gCO₂ per kWh
Annual emissions equal to
Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator
Nearby Stations
Empangan Bakun
Malaysia · Hydroelectric
Bakun Dam
Malaysia · Hydroelectric
Tanjung Kidurong Combined Cycle Plant
Malaysia · Natural Gas
Bintulu Power Station
Malaysia · Natural Gas
Baleh Dam
Malaysia · Hydroelectric
Baram Dam
Malaysia · Hydroelectric
About this plant
Stesen Janakuasa Murum is a significant hydroelectric power plant located in Malaysia, specifically in the state of Sarawak. With a generation capacity of 944 megawatts (MW), it plays a crucial role in the country’s energy sector, contributing to the growing demand for renewable energy sources. Commissioned in 2014, the plant is owned and operated by Sarawak Energy, a key player in Malaysia’s energy landscape. The establishment of the Murum power plant is part of Sarawak’s strategy to harness its abundant natural resources, particularly water, to generate electricity sustainably and efficiently.
As a hydroelectric facility, Stesen Janakuasa Murum utilizes the kinetic energy of flowing water to produce electricity. The plant is situated on the Murum River, where the natural flow of water is harnessed through a dam and turbine system. The process involves collecting water in a reservoir, which is then released through turbines that convert the water’s potential energy into mechanical energy, ultimately generating electrical power. This method of energy production is not only renewable but also has a lower carbon footprint compared to fossil fuel-based power generation, making it an environmentally friendly option.
The environmental impact of Stesen Janakuasa Murum has been a subject of discussion, particularly concerning the ecological changes brought about by dam construction and reservoir creation. While hydroelectric power generation is generally cleaner than fossil fuels, it can disrupt local ecosystems, fish migration patterns, and the livelihoods of communities depending on the river. To mitigate these impacts, Sarawak Energy has implemented various measures, such as ensuring fish passageways and engaging with local communities to address their concerns. Overall, the plant contributes to reducing greenhouse gas emissions and supports Malaysia’s commitment to sustainable energy development.
Regionally, Stesen Janakuasa Murum holds significant importance as it bolsters the electricity supply in Sarawak and contributes to the national grid. By increasing the share of renewable energy in Malaysia’s energy mix, the Murum power plant aids in achieving the country’s targets for energy sustainability and carbon neutrality. It also promotes energy security, reducing reliance on imported fossil fuels and enhancing the stability of the regional energy supply.
The Murum power plant’s contribution extends beyond mere electricity generation; it also supports economic growth by fostering job creation and infrastructure development in the surrounding areas. As Malaysia continues to pursue its energy transition goals, Stesen Janakuasa Murum stands out as a prime example of how hydroelectric power can play a pivotal role in shaping a sustainable energy future for the nation.