Finland

Vaskiluoto 2 — 230 MW Coal

Coal Verified

Vaskiluoto 2 is a 230 MW coal power plant located in Finland. View location, capacity, and technical details.

Capacity
230 MW

Installed

Commissioned
2010

Year online

Owner
Vaskiluodon Voima Oy

Operator

Location
63.09, 21.55

Coordinates

Insights

#7
largest in %s
#2,046
largest %s worldwide
#6,945
largest worldwide
2010
%d yrs newer than avg
1
operated by %s
2
plants within 100 km

Technical Details

Fuel Type
Coal
Capacity
230 MW
Commissioned
2010
Status
Operational
Owner
Vaskiluodon Voima Oy
Country
Finland
Coordinates
63.091, 21.554

Estimated Carbon Footprint

Annual CO₂
908,675 t

tonnes / year

Lifetime CO₂
36.3M t

over ~%d yrs

Intensity
820 g

gCO₂ per kWh

Annual emissions equal to

197,538
cars / year
121,157
homes / year
41.3M
trees to offset

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Nearby Stations

About this plant

Vaskiluoto 2, located in Finland, holds a distinguished position as the 7th largest power generation facility in the country, with a capacity of 230 MW. This coal-fired plant, operated by Vaskiluodon Voima Oy, plays a crucial role in Finland’s energy landscape, contributing about 1.97% to the national capacity of 11,690 MW. Notably, Vaskiluoto 2 ranks as the second-largest coal plant in Finland, a country where nuclear energy is the dominant source of power. This facility stands out not only for its significant capacity but also for being strategically located in an area with limited nearby competition, with only Vaskiluoto kt (26 MW) and Vaaja (3.6 MW) within a 50 km radius. The geographic isolation of Vaskiluoto 2 accentuates its importance in fulfilling local energy needs. As Finland continues to pivot towards renewable energy sources, the role of coal facilities like Vaskiluoto 2 becomes increasingly complex. While coal remains a crucial part of the current energy mix, the Finnish government is committed to reducing reliance on fossil fuels and increasing the share of renewables. The operational history since its commissioning highlights the plant’s longstanding contribution to the Finnish grid, demonstrating its reliability and capacity to respond to energy demands. Looking forward, Vaskiluoto 2 faces challenges and opportunities as it adapts to Finland’s evolving energy landscape, particularly in its potential integration with renewable technologies and its role in achieving the nation’s climate goals.

More %s plants

Spotted an error?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.