Argentina

Urugua-í Dam — 116 MW Hydroelectric

Hydroelectric Renewable Verified

Urugua-í Dam is a 116 MW hydro power plant located in Argentina. View location, capacity, and technical details.

Capacity
116 MW

Installed

Commissioned
1985

Year online

Owner
Energía del Sur S.A.

Operator

Location
-25.88, -54.57

Coordinates

Insights

#115
largest in Argentina
#2,116
largest Hydroelectric worldwide
#9,440
largest worldwide
1985
1 yrs newer than avg
13
operated by Energía del Sur…
9
plants within 100 km

Technical Details

Fuel Type
Hydroelectric
Capacity
116 MW
Commissioned
1985
Status
Operational
Owner
Energía del Sur S.A.
Country
Argentina
Coordinates
-25.877, -54.569

Carbon Footprint

Annual CO₂
9,755 t

tonnes / year

Lifetime CO₂
780,411 t

over ~80 yrs

Intensity
24 g

Est. gCO2/kWh

Annual emissions equivalent to

2,121
cars per year
1,301
homes per year
443,415
trees to offset

Renewable source — life-cycle emissions only (materials/construction), no direct combustion. Open calculator

Nearby Plants

About this plant

Urugua-í Dam is a 116 MW hydroelectric power plant located in Argentina, commissioned in 1985. This facility plays a role in the country’s renewable energy generation through hydroelectric power.

It ranks as the 41st largest hydro plant in Argentina. With 116 MW, it represents 0.38% of Argentina’s total hydro capacity of 30,334 MW. Argentina has 111 hydro plants with a combined capacity of 30,334 MW. Compared to the largest hydro plant, Corpus Christi Dam at 3,800 MW, Urugua-í Dam is about 1/33rd the size.

Hydropower is an essential component of Argentina’s energy portfolio, providing approximately 43% of the country’s electricity. The Urugua-í Dam utilizes the natural flow of the river, contributing to sustainable energy generation. It is located in the Misiones Province, near the border with Paraguay, approximately 200 km from the city of Posadas.