Poland

Elektrocieplownia Czechnica 2 — 179 MW Gás Natural

Gás Natural Verificado

Elektrocieplownia Czechnica 2 é uma usina de 179 MW de gás localizada em Polônia. Veja localização, capacidade e detalhes técnicos.

Capacidade
179 MW

Installed

Comissionada
2025

Year online

Proprietário
ZEW Kogeneracja

Operator

Localização
51.04, 17.14

Coordenadas

Insights

#81
largest in Polônia
#2,743
largest Gás Natural worldwide
#7,857
largest worldwide
2025
26 yrs newer than avg
2
operated by ZEW Kogeneracja
29
plants within 100 km

Localização

Abrir no Google Maps

Detalhes Técnicos

Tipo de Combustível
Gás Natural
Capacidade
179 MW
Comissionada
2025
Status
Operational
Proprietário
ZEW Kogeneracja
País
Poland
Coordenadas
51.039, 17.138

Pegada de carbono

CO₂ anual
345,753 t

tonnes / year

CO₂ de Vida Útil
10,372,585 t

over ~30 yrs

Intensity
490 g

Est. gCO2/kWh

Emissões anuais equivalentes a

75,164
carros por ano
46,100
residências por ano
15,716,037
árvores para compensar

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Usinas Próximas

About this plant

Electrociepłownia Czechnica 2 stands out as Poland’s 81st largest power generation facility among 318 plants, contributing a notable 0.22% to the nation’s electricity landscape. With a capacity of 179 MW, it ranks 14th among the 27 gas plants in the country, highlighting its importance within the regional energy matrix. Commissioned in 2025 by ZEW Kogeneracja, this facility represents a modern approach to power generation, utilizing natural gas to produce electricity and heat, thus aligning with Poland’s ongoing transition from coal dependency.

Technologically, Electrociepłownia Czechnica 2 employs combined heat and power (CHP) systems, enhancing efficiency by simultaneously generating electricity and useful thermal energy. This dual-purpose output is especially vital in urban areas, where demand for heating is significant, particularly during the colder months. The plant’s strategic location near Wrocław allows it to effectively serve the local grid, offering reliable energy while complementing nearby facilities.

Within a 50 km radius, several other power generation facilities operate, including the coal-fired EC Wrocław with a capacity of 263 MW, and the Wrocław combined heat and power plant, which has a capacity of 262.6 MW. These plants, primarily coal-dependent, contrast with Czechnica 2’s cleaner gas technology, underlining the shift toward more sustainable energy sources in the region. Other nearby coal plants, such as Elektrociepłownia Wrocław (260 MW) and EC Czechnica (110 MW), further emphasize the local reliance on coal, which still dominates Poland’s energy profile.

Poland’s energy landscape is characterized by its total capacity of 82,656 MW, with coal as the dominant fuel. The introduction of Electrociepłownia Czechnica 2 marks a critical step in diversifying the fuel mix and reducing greenhouse gas emissions. As the country strives to meet European Union climate targets, facilities like Czechnica 2 will play a pivotal role in transitioning towards a more sustainable future.

The ownership by ZEW Kogeneracja signifies a commitment to modernizing Poland’s energy infrastructure. With its commissioning in 2025, this facility is positioned to significantly impact both local and national energy supply. As Poland continues to navigate its energy transition, Electrociepłownia Czechnica 2 stands as a beacon of progress, showcasing how gas plants can effectively bridge the gap between traditional coal reliance and a cleaner, more sustainable energy future.

More Gás Natural plants

Encontrou um erro?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.