Egypt

New Administrative Capital Power Station — 4,800 MW Gás Natural

Gás Natural Verificado

New Administrative Capital Power Station é uma usina de 4,800 MW de gás localizada em Egito. Veja localização, capacidade e detalhes técnicos.

Capacidade
4,800 MW

Installed

Comissionada
2017

Year online

Proprietário
Egyptian Electricity Holding Company (EEHC)

Operator

Localização
29.91, 31.76

Coordenadas

Insights

#1
largest in Egito
#20
largest Gás Natural worldwide
#94
largest worldwide
2017
18 yrs newer than avg
4
operated by Egyptian Electricity Holding…
51
plants within 100 km

Localização

Abrir no Google Maps

Detalhes Técnicos

Tipo de Combustível
Gás Natural
Capacidade
4,800 MW
Comissionada
2017
Status
Operational
Proprietário
Egyptian Electricity Holding Company (EEHC)
País
Egypt
Coordenadas
29.909, 31.755
Wikipedia
Link

Pegada de carbono

CO₂ anual
9,271,584 t

tonnes / year

CO₂ de Vida Útil
278,147,520 t

over ~30 yrs

Intensity
490 g

Est. gCO2/kWh

Emissões anuais equivalentes a

2,015,562
carros por ano
1,236,211
residências por ano
421,435,636
árvores para compensar

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Usinas Próximas

About this plant

محطة كهرباء العاصمة الإدارية الجديدة is a cutting-edge power generation facility located in Egypt, contributing significantly to the country’s expanding energy landscape. Utilizing natural gas as its primary fuel type, this power plant plays a vital role in supporting Egypt’s commitment to reducing greenhouse gas emissions and enhancing the reliability of its energy supply. With an impressive capacity of 4,800 MW, the plant is among the largest in the region, making it a cornerstone of Egypt’s energy infrastructure.

Geographically positioned at coordinates 29.9087 latitude and 31.7553 longitude, the new administrative capital power plant is strategically located to serve the burgeoning demand for electricity in the newly developed administrative capital of Egypt. Operated by the Egyptian Electricity Holding Company (EEHC), this facility is part of a broader initiative to modernize Egypt’s energy sector and ensure sustainable energy access for its growing population. Commissioned in 2017, the plant reflects the country’s ambitious energy policy aimed at diversifying energy sources and increasing the efficiency of electricity generation.

The technology employed at محطة كهرباء العاصمة الإدارية الجديدة is based on advanced combined cycle gas turbine (CCGT) systems, which are renowned for their efficiency and lower emissions compared to traditional fossil fuel-based power generation technologies. This state-of-the-art technology allows the plant to maximize electricity output while minimizing the environmental footprint, aligning with Egypt’s national strategy to incorporate cleaner energy solutions into its energy mix.

The 4,800 MW capacity of this power plant is significant in stabilizing the electricity grid, particularly in the context of Egypt’s rapid urbanization. As the new administrative capital develops, the demand for reliable and sustainable electricity continues to grow, making this facility crucial to meeting the energy needs of both current and future residents. Additionally, the plant supports Egypt’s aspirations to become a regional energy hub, promoting energy trade and cooperation with neighboring countries.

In summary, محطة كهرباء العاصمة الإدارية الجديدة serves as a vital component of Egypt’s energy generation landscape. With its advanced gas technology, substantial capacity, and strategic location, this power generation facility exemplifies the country’s dedication to modernizing its energy infrastructure and ensuring a sustainable energy future for all.

More Gás Natural plants

Encontrou um erro?

Our data is community-verified. If any detail on this page looks wrong or out of date, let us know and we will review it.