Malaysia

Usina de Ciclo Combinado Tanjung Kidurong — 1,324 MW Gás Natural

Gás Natural Verificado

Usina de Ciclo Combinado Tanjung Kidurong é uma usina de 1,324 MW de gás localizada em Malásia. Veja localização, capacidade e detalhes técnicos.

Capacidade
1,324 MW

Installed

Comissionada
2015

Year online

Proprietário
Sarawak Energy

Operator

Localização
3.29, 113.09

Coordenadas

Insights

#20
largest in Malásia
#431
largest Gás Natural worldwide
#1,531
largest worldwide
2015
16 yrs newer than avg
25
operated by Sarawak Energy
6
plants within 100 km

Localização

Abrir no Google Maps

Detalhes Técnicos

Tipo de Combustível
Gás Natural
Capacidade
1,324 MW
Comissionada
2015
Status
Operational
Proprietário
Sarawak Energy
País
Malaysia
Coordenadas
3.291, 113.093

Pegada de carbono

CO₂ anual
2,557,412 t

tonnes / year

CO₂ de Vida Útil
76,722,358 t

over ~30 yrs

Intensity
490 g

Est. gCO2/kWh

Emissões anuais equivalentes a

555,959
carros por ano
340,988
residências por ano
116,245,996
árvores para compensar

Indicative estimate from standard life-cycle emission and capacity factors — not a measured figure. Open calculator

Usinas Próximas

About this plant

The Tanjung Kidurong Combined Cycle Plant is a critical gas-fired power generation facility in Malaysia, boasting a capacity of 1,324 MW. This power plant plays a vital role in the nation’s energy generation strategy, enhancing the reliability and efficiency of the electrical supply in the region. Utilizing combined cycle technology, Tanjung Kidurong maximizes energy output by using waste heat from gas turbines to produce additional electricity, making it one of the more efficient forms of energy generation available. Located at coordinates 3.2908, 113.0929, the plant is strategically positioned to serve the growing energy needs of the local population and industries. Operated by Sarawak Energy, Tanjung Kidurong is integral to the grid, ensuring that it meets the increasing demand for electricity while adhering to Malaysia’s energy policies that emphasize sustainability and reduced emissions. The facility’s substantial MW capacity underscores its importance in the energy mix of Malaysia, providing a stable power supply that supports both economic growth and environmental goals. As the country progresses towards a diversified energy portfolio, the Tanjung Kidurong Combined Cycle Plant exemplifies the role of gas technology in achieving these objectives, highlighting its contribution to a sustainable energy future.

More Gás Natural plants

Encontrou um erro?

Our data is community-verified. If any detail looks wrong or out of date, suggest a correction below — our team reviews and applies approved changes across all languages.